
12MO Evolutive v2 – Compact Electric Workshop Mini Crane (1250 kg)
Narrow electric mini crane lifting up to 1250 kg, passing through 1.90×0.90 m doors. Equipped with 18° slewing ring and 600 mm vertical mast for precise handling in tight industrial spaces.

12MO S180 v2 – Compact Mini Crane with 180° Rotation and Vertical Mast
Up to 1,000 kg lifting capacity, 180° hydraulic rotation, and optional vacuum lifting system – ideal for maintenance and glass handling.

20MT 3x1 TC – Electric Mobile Crane with Variable Wheelbase and 18° Slewing
Up to 2,160 kg lifting capacity, radio-controlled, and adjustable wheelbase – perfect for heavy lifting in confined spaces.

25 MW for the energy transition: Successful boiler installation in the Lausitz industrial park
ETABO is installing a 25 MW electrode boiler, feedwater tank and electric superheater on schedule in BASF's new power-to-heat plant in Schwarzheide – an important project step for sustainable steam generation.

40MS 4x2 R – Heavy-Duty Electric Mini Crane for Industrial Lifting
Up to 4,000 kg capacity, fully radio-controlled, optional 18° slewing ring – perfect for maintenance and precision lifting.

40MS 4x2 R – Radio‑Controlled Industrial Mini Crane (4000 kg)
Fully radio‑controlled electric mini crane with reinforced double telescopic boom, up to 4000 kg capacity and optional 18° slewing ring. Ideal for precise industrial lifting in confined spaces.

6 Gründe
6 Gründe, warum Sie Instandhaltung bei der Digitalisierung Ihrer Produktion mitbedenken sollten

A+E Keller
72% lower downtime with Scable maintenance software

ABB Standard Motors
ABB Standard Motors - now available from Stock

Accurex AI - Smart Anomaly Detection for Predictive Maintenance
Acoem Accurex AI: From Supervised Learning to Smart Exception

Activation process in the energy industry
Mastering the activation process in the energy industry

AI (Artificial Intelligence) vs. HI (Human Intelligence)
Wer macht das Rennen und wie sehen die Herausforderungen in der Instandhaltung in Zukunft aus? In diesem Beitrag beleuchten wir Herausforderungen in der Instandhaltung, die durch die aktuelle COVID-19-Situation sogar beschleunigt werden.

Arbeitsbühne JLG EcoLift
Arbeitsbühne JLG EcoLift

Arbeitsbühne JLG Nano SP
Arbeitsbühne JLG Nano SP

Artificial intelligence as a co-pilot for greater efficiency and clarity in illustrated instructions.
Familiar work steps often run intuitively. Translating them into a good set of instructions, however, is a challenge. Explaining complex processes in a way that is understandable to everyone is very different from carrying them out in practice.
217 results found